Crashes when every field-protocol parser is fuzzed with malformed and hostile traffic, on every build. Hardened by design.

1

Server in control at any moment. The hot standby takes over automatically, in seconds, once it holds the control lease.

SBOM

From day one. Every release is signed, scanned and fully listed.

100%

Of logins, commands and approvals written to the tamper-evident security trail.

From the Ozari release test suite. Ask for the evidence pack to see the reports.

Evidence log

Break it on purpose, before the field does

Our tests assume the network, the devices and the operators will all do something unexpected. Each record says what we tested, how, and where the result is written down.

EV-01 · Quality

41/0

Test packages passing and failing

Unit and integration tests run on every package in every build of Ozari Grid.

Release test suite

EV-02 · Quality

0

Data races

The race detector runs across the whole code base on every build.

Release test suite

EV-03 · Protocols

0

Crashes under fuzzing

Coverage-guided fuzzing of the IEC 104, DNP3, Modbus and gateway parsers on every build, with a corpus replay for regressions. The parsers are hardened against malformed and hostile traffic.

Release test suite

EV-04 · Resilience

40

Hostile connections at once

Malformed, oversized and truncated frames, then a 40-connection flood against a live gateway. No panic and no leaked connections.

Release test suite

EV-05 · Resilience

1

Server in control at a time

We crash the primary server and watch the hot standby take over. It never operates until it holds the control lease, so control never splits between two servers.

Release test suite

EV-06 · Quality

59/59

Deployment validation checks

The deployment validation suite. All 59 checks pass and none fail.

Release test suite

EV-07 · Protocols

18/18

IEC 60870-5-104 conformance tests

The conformance suite, run against the native IEC 104 driver.

Conformance report

EV-08 · Security

100%

On the security trail

Every login, command, approval and change is written to a hash-chained, write-once trail, and every read needs a signed-in session. Your auditor can verify the trail offline.

Release test suite

EV-09 · Security

0

Open security review findings

A pre-release security review. Every finding is fixed and covered by a regression test.

Security review

EV-10 · Protocols

3

Protocols tested with vendor reference servers

IEC 104, IEC 61850 and DNP3 exchanged data and controls with vendor reference servers, and an approved command operated a reference IED.

Interoperability records

EV-11 · Protocols

50/50

Field input and output operations

The Ozari Base regression suite over IEC 104 and IEC 61850, against simulated devices.

Regression report

EV-12 · Security

SBOM

From day one, for every release

Every release ships with a software bill of materials, a vulnerability scan and a signature you can verify. The control plane never speaks raw field protocols; those stay behind the fault-isolated gateway.

Release test suite

Ask for the evidence pack to see the reports behind each record.

Standards

Security standards and best practice

Ozari conforms to the requirements of ISA/IEC 62443 and follows recognised practice for securing operational technology. Each line says how.

StandardStatusWhy it matters
ISA/IEC 62443Conforms Conforms to the requirements of the ISA/IEC 62443 series, with zones, conduits and an evidence map for each requirement. Target security level SL 2, with support for higher-level controls: dual approval (IEC 62443-3-3 SR 2.1 RE 4, SL 4), supervisor override (SR 2.1 RE 3, SL 3), multi-factor authentication on all networks (SR 1.1 RE 3, SL 4) and audit records on write-once storage (SR 3.9 RE 1, SL 4).The main security standard for industrial automation and control systems. The evidence map saves your assessor time.
IEC 62351-3 and -4Built in Mutual TLS in the Ozari Base protocol drivers, following IEC 62351.Security for power-system protocols: encrypted, authenticated links to the field.
IEC 61850-7-2 control modelSupports Every control model, including select-before-operate with enhanced security. The device declares its model and Ozari follows it.How substation devices take commands safely: reserve the device, operate, then confirm the result.
IEC 60870-5-104 and DNP3 (IEEE 1815-2012)Supports Select-before-operate on both: the select/execute qualifier of IEC 60870-5-101 subclause 7.2.6.26, and DNP3 SELECT and OPERATE. DNP3 Secure Authentication (IEEE 1815-2012 clause 7).Telecontrol commands that are armed first and then executed, with authenticated control messages on DNP3.
NIST SP 800-53 AC-3(2)Supports Dual authorisation for the actions you define. Automation armed in advance keeps immediate safety responses possible, as the control guidance allows.The US federal control for dual authorisation of critical actions.
NIST SP 800-82 Rev. 3Followed Segmented zones, an OT DMZ, one-way data to the enterprise and fail-safe behaviour follow its guidance.The US guide to securing operational technology, used by utilities around the world.
Secure by designBuilt in Memory-safe Go, multi-factor authentication, role-based access, a tamper-evident security trail and fail-safe behaviour are part of the product.Joint guidance from the Australian Cyber Security Centre, CISA and partner agencies: security is the vendor’s job, not an add-on.
Software supply chainPractised An SBOM from day one, plus a vulnerability scan and a signature on every release, recorded in a transparency log. A lean, fully listed set of dependencies, with fuzzing and race testing on every build. SLSA level 1 to 2 practices.Integrity of the software, from source code to the binary you run.
NIST Cybersecurity Framework 2.0Supports Ozari controls support its protect, detect, respond and recover functions.A common language for cyber risk across IT and OT.
AESCSFSupports Controls and evidence help energy operators reach their target maturity.The Australian Energy Sector Cyber Security Framework, used to assess and improve cyber maturity across the energy sector.
NERC CIPAligned to intent Aligned to the control intent. Whether it applies is the utility’s decision.North American security rules for the bulk power system. Most distribution networks are outside their scope.
ISA-18.2Built in Alarm performance metrics are built in. Alarm rationalisation remains the operator’s task.The alarm management standard. It helps keep alarm floods and standing alarms under control.
IEC 61970 / 61968 (CIM, CGMES)Tested Core-class import and export, round-trip tested.The common model for network data, so models move between tools without being typed in again.
OCSF and MITRE ATT&CK for ICSMapped Findings emitted in OCSF. Detections mapped to ATT&CK for ICS techniques. Mappings, not guarantees.Shared formats and terms, so your security team can use the findings in its own tools.
Field protocolsVaries See the protocol status table.Each protocol is labelled by how far it has been proven.

Scope and assumptions

What we want you to know up front

  • The security trail is anchored to external write-once storage at go-live.
  • Automation that an administrator arms, such as self-healing, acts without a per-action approval. It never skips crew tags, the control lease or the audit.
  • Screens on this site show simulated data from the Ozari demonstration network.

Security disclosure

Found a vulnerability? Tell us privately

Please report it through our contact form and choose “Something else”. Include enough detail for us to reproduce it. We will acknowledge your report and work with you on a fix and on disclosure.

Responsible AI

ozari+ advises and never operates, and it can never approve its own improvements. Read how it is designed around the December 2025 AI-in-OT principles, or get our free buyer’s checklist.

Start safely

Begin with a read-only trial

Ozari runs beside your current systems, sees the same data and issues no commands. You measure the value with your own data before anything changes.