Engineering for the renewable grid

Controls, SCADA, protocol, OT security and commissioning engineering, from the team that builds Ozari. We apply the same test discipline to your project that we apply to our own product.

8 months

Average time to sign a NEM connection agreement, up from 2 months in FY22.

AEMO, QED Q2 2026

75.4 GW

New generation and storage in the NEM connection process.

AEMO, QED Q2 2026

57,000+

Skilled workers the NEM will need by 2050, up from about 36,000 in 2025.

AEMO, 2026 ISP

15+

Engineering occupations in national shortage, including electrical engineering.

Engineers Australia, 2025

Services

What we do

Six practices, one standard of evidence.

Control systems and SCADA

  • Architecture and redundancy
  • Point databases and naming
  • HMI and alarm design, with ISA-18.2 metrics
  • Historians and reporting

Substation automation and protocols

  • IEC 61850, IEC 60870-5-104, DNP3, Modbus
  • OPC UA and MQTT Sparkplug B
  • Gateway and front-end design
  • Interoperability testing

OT cybersecurity engineering

  • IEC 62443 zones and conduits
  • Asset inventory and credentials
  • Secure remote access
  • Incident readiness and isolation planning

Data and integration

  • CIM/CGMES network models
  • Historian and security analytics integration
  • APIs and data quality
  • Migration from legacy systems

Testing and commissioning

  • Factory and site acceptance tests
  • Shadow runs beside the incumbent
  • Cutover and rollback plans
  • Documentation and handover

Connection support: controls and data

  • Control-system documentation
  • SCADA point lists for network operators
  • Test evidence for performance checks
  • Support at registration and commissioning

Method

Read-only first. Then staged. Always tested

The same path we use to bring Ozari into a control room.

  • Discover Understand the network or plant, the systems in place and the constraints.
  • Design Architecture, zones, point lists and test plans, reviewed with your engineers.
  • Build Configure, integrate and document. Every change is traceable.
  • Factory test Acceptance tests against the agreed plan, with recorded results.
  • Site test Site acceptance tests, then a shadow run beside your current system.
  • Support Runbooks, drills and upgrades after go-live.

Engagement

Ways to work with us

Fixed-scope study

A security, architecture or integration review with a written report and a prioritised plan.

Project delivery

Design, build, test and commission a defined scope, with clear acceptance criteria.

Embedded engineers

Our engineers join your team for a phase of work, under your processes.

Operations support

Runbooks, failover and isolation drills, upgrades and on-call advice.

How we work

Evidence over claims

  • Evidence you can hand to an auditor. Test plans, results and configuration records, not slides.
  • Safe change. Read-only first, then staged. Every cutover has a rollback plan.
  • Open standards. We design for interoperability, so you are not locked in to us or anyone else.
  • Plain documentation. Written so the next engineer can understand it at 3 a.m.

Start safely

Begin with a read-only shadow pilot

Ozari runs beside your current systems, sees the same data and issues no commands. You measure the value with your own data before anything changes.